surveyiii···ing.com
Project Spotlight

How We Set Out the Gateshead Millennium Bridge to ±2mm

AR
A. Reid, MRICS
2026-01-28 · 12min read
Full Article

The Gateshead Millennium Bridge required setting out a 105-metre tilting arch to millimetre tolerances — in a tidal zone, with instrument positions constrained by scaffolding and the geometry of the site.

case-studystructuralbridgehigh-precisionsetting-out

Discussion

0 comments
to join the discussion.
No comments yet. Be the first to respond.